April 20, 2024

Optimised warehouse logistics


 
The specialist meat processing machine manufacturer, K+G Wetter have now made investments in warehouse logistics at its facility in the Breidenstein district of  Biedenkopf in the German State of Hesse. This is followed by its expansion of its production areas in 2018 and 2020 and the associated optimisation of operating procedures.

By optimising its entire processes, K+G Wetter intends to continue strengthening its market position. Especially for a medium-sized enterprise like K+G Wetter, flexibility is an extremely important tool for setting the company apart from the ever-growing number of market players. The redesign of the warehouse logistics combined with the conversion almost doubled the storage capacity for pallet storage spaces and in the shelf storage area. In the process, the small parts warehouse has been expanded to two levels.

Source: K+G Wetter

Related articles

Israel Prime Minister tastes Aleph Farms cultivated steak

Israel’s Prime Minister visits Aleph Farms

As part of a national policy plan to establish Israel as an alternative protein leader, Prime Minister Benjamin Netanyahu is the first head of state to taste meat cultivated outside of a cow Positioning the nation at the forefront of a global alternative protein ecosystem, Israel’s Prime Minister visited Aleph Farms, a cultivated meat company

World’s most sustainable protein producers

In Singapore, where each person consumes an average of 21 kilogrammes of seafood per year, nearly half of the respondents (47 percent) indicated a preference for Norwegian seafood and salmon over that of other countries. This was echoed by consumers in Taiwan (45 percent), Thailand (36 percent) and Malaysia (35 percent). Three Norwegian seafood companies